Fused spur
A fused spur is an electrical supply accessory that incorporates a fuse. This fuse, with a lower rating than the fuse for a ring man, allows an electrical supply using one feed cable to a socket to be taken off a ring main.
Fused spurs are commonly used as an alternative to a conventional socket, for the installation of powerful electrical appliances that can be installed without a plug, such as ovens, washing machines, electric heaters, dishwashers, fridges, and so on. For safety and maintenance purposes, these sorts of appliances may require installation on a separate cable from the ring main.
Switched fused spurs include a manual on/off switch, while unswitched fused spurs do not.
| |
|
| switched fused spur | electrical symbol for switched fused spur |
A variation is a double pole fused spur switch which incorporates an extra isolation feature. This makes the switch safer to use as it separates the live and neutral wires.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.



















Comments
So if the building is being let this should not stop the tenant replacing the fuse?